Manage, monitor and track every RTI throughout its statutory lifecycle.
| Ref & Date | Subject & Authority | Workflow Status | Category | Priority | Deadline | Assigned Officer | Actions |
|---|---|---|---|---|---|---|---|
SAMPLE-RTI-12 Jul 2026 | Pothole repair work — Ward road, status and work orderBruhat Bengaluru Mahanagara Palike (BBMP) · Ward 1 | Awaiting Reply Next: PIO Reply | Road work | High | 54d overdueDue: 21 Jun 2026 | Unassigned43d ago | |
PIO Contact & Authority Officer: Assistant Executive Engineer (Sample) Designation: AEE Phone: — Email: — Info Requested & Scope 1. Provide a certified copy of the work order for the pothole repair work on [ROAD NAME]. 2. Provide the name and registration details of the contractor. 3. Provide the date of completion and the completion certificate. Statutory Timeline Filed: 20 May 2026 Reply due: 21 Jun 2026 FAA due: 21 Jul 2026 | |||||||
SAMPLE-RTI-22 Jul 2026 | Garbage contractor details and payment for the wardBruhat Bengaluru Mahanagara Palike (BBMP) · Ward 2 | Awaiting Reply Next: PIO Reply | Garbage | Medium | 75d overdueDue: 31 May 2026 | Unassigned43d ago | |
PIO Contact & Authority Officer: Health Officer (Sample) Designation: Health Officer Phone: — Email: — Info Requested & Scope 1. Provide the name of the garbage-collection contractor for the ward. 2. Provide the monthly payments released to the contractor for the last 12 months. 3. Provide the attendance / trip records of the collection vehicles. Statutory Timeline Filed: 29 Apr 2026 Reply due: 31 May 2026 FAA due: 30 Jun 2026 | |||||||
SAMPLE-RTI-32 Jul 2026 | Drain construction — measurement book and quality controlBruhat Bengaluru Mahanagara Palike (BBMP) · Ward 3 | Partial Reply Next: First Appeal | Drain work | High | 71d overdueDue: 10 May 2026 | Unassigned43d ago | |
PIO Contact & Authority Officer: Executive Engineer (Sample) Designation: EE Phone: — Email: — Info Requested & Scope 1. Provide a certified copy of the Measurement Book entries for the drain construction. 2. Provide the quality-control inspection report. 3. Provide the name of the check-measuring officer. Statutory Timeline Filed: 8 Apr 2026 Reply due: 10 May 2026 FAA due: 4 Jun 2026 | |||||||
SAMPLE-RTI-42 Jul 2026 | Tender irregularity in footpath works — full tender fileBruhat Bengaluru Mahanagara Palike (BBMP) · Ward 4 | FAA Order Received Next: Second Appeal | Tender | Urgent | 50d overdueDue: 31 Mar 2026 | Unassigned43d ago | |
PIO Contact & Authority Officer: Executive Engineer (Sample) Designation: EE Phone: — Email: — Info Requested & Scope 1. Provide the complete tender file for the footpath works. 2. Provide the bid comparison statement and evaluation notes. 3. Provide the file movement and approval notings. Statutory Timeline Filed: 27 Feb 2026 Reply due: 31 Mar 2026 FAA due: 24 Apr 2026 | |||||||
SAMPLE-RTI-52 Jul 2026 | Dangerous open electrical junction box — immediate hazardBruhat Bengaluru Mahanagara Palike (BBMP) · Ward 5 | Filed Next: PIO Reply | Streetlight | Urgent | 60d overdueDue: 13 Jul 2026 | Unassigned43d ago | |
PIO Contact & Authority Officer: Assistant Engineer (Sample) Designation: AE Phone: — Email: — Info Requested & Scope 1. Provide the action taken to make safe the open electrical junction box at [LOCATION]. 2. Provide the name of the officer responsible for streetlight maintenance in the ward. Statutory Timeline Filed: 12 Jun 2026 Reply due: 13 Jul 2026 FAA due: 12 Aug 2026 | |||||||
Bruhat Bengaluru Mahanagara Palike (BBMP) · Ward 1
Bruhat Bengaluru Mahanagara Palike (BBMP) · Ward 2
Bruhat Bengaluru Mahanagara Palike (BBMP) · Ward 3
Bruhat Bengaluru Mahanagara Palike (BBMP) · Ward 4
Bruhat Bengaluru Mahanagara Palike (BBMP) · Ward 5